Register Today to Work Alongside Industry Leaders to Learn Advanced Swim-Pond Construction Techniques

Published on December 28, 2024

Envisioned by Shaun Lindley as a tribute to his wife and grandchildren and organized by the Pond Professionals Alliance, this 40-by-80 swim pond build on March 3 – 4 will be one to remember! Designed and led by Craig McBride (Swim Pond and All Aquatics) and Larry Carnes (Reflections Water Gardens) in the days leading up to Water Garden Expo, this project will utilize a unique hybrid-filtration approach and include the following exciting components:

• Newly released, material-reducing wetland filtration components, drastically reducing the amount of gravel needed for wetland construction

• Updated user-friendly ozone system

• Walk-in sandy beach area

• Massive, handpicked boulders, natural stone steps and jumping rocks

• Sheer vertical walls using stained, precast Verti-Blocks. 

Join us to build community, strengthen our industry, and learn new techniques in Krebs, Oklahoma (approximately 100 miles from Shawnee).

form.jotform.com/pondprosalliance/wge-group-build-registration

HNA Ad 2026

Leave a Comment

Your email address will not be published. Required fields are marked *

More Articles

Introducing the AquaMax Eco Titanium Pond Pump

Atlantic-Oase introduces the newest pump in the Pulse 6 line, the AquaMax Eco ...

Inside a 360-Degree Koi Pond Environment

In Friendswood, Texas, what began as a pond renovation quickly evolved into one ...

July / August 2026

The Spaces We Create One of the things I enjoy most about putting ...

Show Us Your Trophies!: Congrats to our 2025 Water Artisans of the Year

From all of us here at POND Trade Magazine, we appreciate everyone who ...
Scroll to Top