Register Today to Work Alongside Industry Leaders to Learn Advanced Swim-Pond Construction Techniques

Published on December 28, 2024

Envisioned by Shaun Lindley as a tribute to his wife and grandchildren and organized by the Pond Professionals Alliance, this 40-by-80 swim pond build on March 3 – 4 will be one to remember! Designed and led by Craig McBride (Swim Pond and All Aquatics) and Larry Carnes (Reflections Water Gardens) in the days leading up to Water Garden Expo, this project will utilize a unique hybrid-filtration approach and include the following exciting components:

• Newly released, material-reducing wetland filtration components, drastically reducing the amount of gravel needed for wetland construction

• Updated user-friendly ozone system

• Walk-in sandy beach area

• Massive, handpicked boulders, natural stone steps and jumping rocks

• Sheer vertical walls using stained, precast Verti-Blocks. 

Join us to build community, strengthen our industry, and learn new techniques in Krebs, Oklahoma (approximately 100 miles from Shawnee).

form.jotform.com/pondprosalliance/wge-group-build-registration

Kloubec Koi Farm

Leave a Comment

Your email address will not be published. Required fields are marked *

More Articles

September / October 2026

Built to Evolve There is something special about seeing what happens after the ...

Meet the 2026 Water Artisans of the Year Judges

Meet the distinguished industry professionals selected to judge the 2026 Water Artisans of ...

Inside the World’s Largest Koi Collection

Greenhouse No. 2 pond construction by Fitz’s Fish Ponds.  Once in a lifetime, ...

Introducing the Reimagined Water Artisans of the Year Awards

For over a decade, the Water Artisans of the Year Awards have celebrated ...
Scroll to Top