Register Today to Work Alongside Industry Leaders to Learn Advanced Swim-Pond Construction Techniques

Published on December 28, 2024

Envisioned by Shaun Lindley as a tribute to his wife and grandchildren and organized by the Pond Professionals Alliance, this 40-by-80 swim pond build on March 3 – 4 will be one to remember! Designed and led by Craig McBride (Swim Pond and All Aquatics) and Larry Carnes (Reflections Water Gardens) in the days leading up to Water Garden Expo, this project will utilize a unique hybrid-filtration approach and include the following exciting components:

• Newly released, material-reducing wetland filtration components, drastically reducing the amount of gravel needed for wetland construction

• Updated user-friendly ozone system

• Walk-in sandy beach area

• Massive, handpicked boulders, natural stone steps and jumping rocks

• Sheer vertical walls using stained, precast Verti-Blocks. 

Join us to build community, strengthen our industry, and learn new techniques in Krebs, Oklahoma (approximately 100 miles from Shawnee).

form.jotform.com/pondprosalliance/wge-group-build-registration

Kloubec Koi Farm

Leave a Comment

Your email address will not be published. Required fields are marked *

More Articles

C&A Financial to Offer Tax Webinar for Business Owners

Attend the C&A Tax Webinar, Friday, Nov. 14 at 9 am ET Are ...

November / December 2025

Every so often, an issue of POND Trade comes together with such synergy ...

The Contractor’s Guide to Success with Automation

What I’m about to share with you changed everything about how I view ...

When Your Pond Runs Out of Air

Why Oxygen is the Heartbeat of Your Pond Still, quiet water can be ...

Contractor's Corner

Sponsored by Pondliner

Scroll to Top